06-18-2007, 03:49 PM
Okay - I have a first draft of the covered bridge tour... it's pretty rough right now and needs some work, but the hard part is done.
The next step is to drive it and fix all the problems that I already see.
If all goes well and all the bridges are open we'll manage to cover 10 of the 12 bridges. I'm not expecting all of them to be open, so I'll be happy if we get 7 or 8 in the final draft of the tour.
The next step is to drive it and fix all the problems that I already see.
If all goes well and all the bridges are open we'll manage to cover 10 of the 12 bridges. I'm not expecting all of them to be open, so I'll be happy if we get 7 or 8 in the final draft of the tour.
Well 'ard: British Slang. Very Tough. Very Good.
Life is too short to travel in the slow lane.
Life is too short to travel in the slow lane.