06-23-2007, 12:16 PM
All - I ran the first half of the covered bridge tour today. We are going to have to change the starting point from Washington Crossing to the Lamberville location that we have used previously (see the update above).
Sorry for the inconvenience, but I think it will make for a better drive for us.
When I started the drive I found out that the starting point was too far from the first bridge, so had to be changed.
The roads I drove today were very nice and quiet - tree lined - perfect for us.
Of the 5 bridges we drove, we'll be able to visit 4 of them. The lead up to the last one was a steep incline only wide enough for one car, so we had to scratch that one from the list.
Of the 6 remaining bridges, we know that one is closed, but that still leaves us with a potential of 8-10 bridges, which I think will give us a good drive.
Sorry for the inconvenience, but I think it will make for a better drive for us.
When I started the drive I found out that the starting point was too far from the first bridge, so had to be changed.
The roads I drove today were very nice and quiet - tree lined - perfect for us.
Of the 5 bridges we drove, we'll be able to visit 4 of them. The lead up to the last one was a steep incline only wide enough for one car, so we had to scratch that one from the list.
Of the 6 remaining bridges, we know that one is closed, but that still leaves us with a potential of 8-10 bridges, which I think will give us a good drive.
Well 'ard: British Slang. Very Tough. Very Good.
Life is too short to travel in the slow lane.
Life is too short to travel in the slow lane.