03-06-2008, 05:07 PM
The 11 Phase 1 buildings are progressing nicely. The concession building is behind schedule but the crew is working long hours to catch up.
Of the 38 constructed villas, 36 have been sold, one is being used as a model and one is available for sale.
Weather permitting, paving of the Lightning course is scheduled to pick back up Mid-March. The 1.1 mile F1 Karting track located in Lightning’s infield is scheduled to be paved at the same time. Lightning’s top coat will be complete in April which will allow cars on a cured track in July.
The owners are confident that the grand opening will not be postponed.
Of the 38 constructed villas, 36 have been sold, one is being used as a model and one is available for sale.
Weather permitting, paving of the Lightning course is scheduled to pick back up Mid-March. The 1.1 mile F1 Karting track located in Lightning’s infield is scheduled to be paved at the same time. Lightning’s top coat will be complete in April which will allow cars on a cured track in July.
The owners are confident that the grand opening will not be postponed.